On-Air Now

<h3>Music Programming</h3><br><p><span>ON AIR</span><br><a href='https://rdo.to/CKYE' target='_blank' style='margin-right:4px'><img src='https://vancouver.redfm.ca/wp-content/uploads/2018/03/btn_listenlive.jpg' width='108' height='23'></a></p>

Music Programming


ON AIR

Listen Live
 

Surrey-Langley Skytrain: An Update

 

TransLink has released new details and cost estimates for the proposed Surrey Langley SkyTrain project. Three staging scenarios have been developed and could be fully constructed within five-and-a-half years from a full project approval date. Currently there is approximately $1.6 billion available in funding, which is enough to see the project reach Fleetwood. These funds had previously been allocated to the Surrey-Newton-Guildford Light Rail Transit Project. Any work beyond this amount is unfunded and would require contributions from other sources. Project Director of Surrey-Langley Skytrain Jeff Busby steps into RedFM studios to talk about this project followed by MP Ken Hardie.